- Animation [1]: Sutong Bridge Cable Stayed Segment
Mr. H. F. Xiang - Duration: 3:15 minutes
- Event:
- Keywords: Sutong Bridge, Cable Stayed Segment, Cable-Stayed Bridge, Steel Box Girder, Long Span, Nonlinearity, Damper, Structural System, Global Analysis
- Summary:
- Animation [2]: From IABSE E-Learning_Lecture 12: Adding confidence and reducing risk - the role of independent design checking in major projects: Stockton deck wind tunnel testing
Mr. Ian Firth - Duration: 36:00 Seconds
- Event:
- Keywords: Stockton Deck Wind Tunnel Testing, Wind tunnel testing
- Summary:
- Animation [3]: From IABSE E-Learning_Lecture 17: Woodrow Wilson Bridge Bascule Span
Mr. Sean Bluni - Duration: 22:00 Seconds
- Event:
- Keywords: Bridge Bascule Span, Bascule Span Leaf Operation, Woodrow Wilson Bridge
- Summary:
- Animation [4]: From IABSE E-Learning_Lecture 22: Structures for Stadium Projects :Retractable roof operation
Dipl. -Ing. Knut Goppert - Duration: 08:00 Seconds
- Event:
- Keywords: Structures for Stadium, Retractable roof operation
- Summary:
- Animation [5]: From IABSE E-Learning_Lecture 22: Structures for Stadium Projects
Dipl. -Ing. Knut Goppert - Duration: 08:00 Seconds
- Event:
- Keywords: Structures for Stadium, Retractable roof operation
- Summary:
- Animation [6]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Simply Supported Beam Assembly
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Simply Supported Beam Assembly, Precast girder construction
- Summary:
- Animation [7]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Launching Gantry & Segment Placing Step by Step Process
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Bridge construction, Launching Gantry, Segment Placing Step by Step Process
- Summary:
- Animation [8]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Progressive Segment Assembly Step by Step Process
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Bridge construction, Progressive Segment Assembly
- Summary:
- Animation [9]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Span-by-Span Construction Technique Step by Step Process
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Bridge construction, Span-by-Span Construction
- Summary:
- Animation [10]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Pre-Assembled Span-by-Span Erection Step by Step Process
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Bridge construction, Pre-Assembled Span-by-Span
- Summary:
- Animation [11]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Short Line Prefabrication Method
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Bridge construction, Short Line Prefabrication Method
- Summary:
- Animation [12]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Long Line Prefabrication Method
Mr. Jacques Combault - Duration: 08:00 Seconds
- Event:
- Keywords: Bridge construction, Long Line Prefabrication Method
- Summary:
- Animation [13]: Le Viaduc de Millau: Animation of Bridge Construction-1
Eiffage CEVM / Foster & Partners / auteur du DVD - Duration: 16:00 Seconds
- Event:
- Keywords: Viaduc de Millau, Bridge Construction
- Summary:
- Animation [14]: Le Viaduc de Millau: Animation of Bridge Construction-2
Eiffage CEVM / Foster & Partners / auteur du DVD - Duration: 06:00 Seconds
- Event:
- Keywords: Viaduc de Millau, Bridge Construction
- Summary:
- Animation [15]: Le Viaduc de Millau: Mode shapes for service wind
Eiffage CEVM / Foster & Partners / auteur du DVD - Duration: 04:00 Seconds
- Event:
- Keywords: Viaduc de Millau, Mode shapes for service wind
- Summary:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|