- Video [1]: Vaux Viaduct (low resolution for dial up connections)
Prof. Dr. Manfred A. Hirt - Duration: 8:29 minutes
- Event:
- Keywords: Design for Launching, Deck Slab Construciton
- Summary:
- Video [2a]: Bridge Over Dala River_part 1/2 (low Resolution for dial up connections)
GEFYRA - Duration: 14:44 minutes
- Event:
- Keywords: Steel Bridge, Bridge over Dala River
- Summary:
- Video [2b]: Bridge Over Dala River_part 2/2 (low resolution for dial up-connections)
Eiffage CEVM / Foster & Partners / auteur du DVD - Duration: 7:15 minutes
- Event:
- Keywords: Steel Bridge, Bridge over Dala River
- Summary:
- Video [3]: The Rion Antirion Bridge - Harilaos Trikoupis Bridge
Eiffage CEVM / Foster & Partners / auteur du DVD - Duration: 42:00 minutes
- Event:
- Keywords: Design Criteria, Design Phase,Reinforced Soil and Foundation Concept, Analyses of Reinforced Soil, Dynamic Analysis of Bridge, Behaviour of Reinforced Soil, Push-Over Analyses of Pylons,Pylon Base, Foundations and Tension Leg
Platform, Cable-Stayed Bridge, Cable Stayed Bridge
- Summary:
- Video [4]: Le Viaduc de Millau
- Duration: 40:40 minutes
- Event:
- Keywords: Bridge deck, Piers, Bridge Cross-Section, Launching System, Pylons Concept, Piers, Cable-Stayed Bridge, Cable Stayed Bridge
- Summary:
- Video [5]: Vertical Lift bridge over the River Seine in Rouen
- Duration: 12:00 minutes
- Event:
- Keywords: Lift bridge, steel, wind, dolphins, architecture
Platform
- Summary:
|
|
|
|
|
|
|