• Summary:- The new San Francisco-Oakland Bay Bridge will replace the seismically vulnerable East Spans of the existing bridge. The Integrated Shop Drawing process was used during design and construction of critical concrete components of this structure. The final design plans generated are considered to be the next generation of design plans (a hybrid between design plans and shop drawings). These design plans are representative of a fully integrated 3D model and are prepared in color with structural elements between plans being color coordinated, utilize bar bending detailing standards as well as use bar callouts which are based on reinforcement supplier industry standards.
  • Keywords:- 3D Modeling, Clash Detection, Integrated Shop Drawings, San Francisco-Oakland Bay Bridge, Suspension Bridge, Steel Bridge.
  • Duration:- 20:00 minutes