• Summary:- This presentation will focus on the design, fabrication, and erection for the replacement of the suspended structure of Lions' Gate Bridge. This is believed to be the first time a major suspension bridge has had its entire suspended structure replaced while maintaining daytime traffic (Summary from the paper published in the IABSE conference, Seoul, Korea, June 2001)
  • Keywords:- Bridge, Existing, Major, Suspension, Cable-stayed, Load, Upgrading, suspension bridge, deck replacement, orthotropic deck, renovation.
  • Duration:- 66:44 minutes
  • Event:- Lectures at ETHZ